Paving Projects, 2010

Updated on September 24, 2010

As part of the Paving Bond that was passed last fall the City will begin its paving season. The excellent spring weather has allowed us to begin the paving schedule early. Listed below is the preliminary schedule through the summer. We will be adjusting the schedule periodically.

Elm Street: Complete The city is installing about 120 feet of new sewer to eliminate the combined sewer over flow that would discharge storm and sanitary waste to the river in extreme wet weather conditions. The trench will be paved with base pavement and then allowed to settle prior to grinding the patch curb to curb after Labor Day. This will minimize the patch to two butt joints at the beginning and end of the project.

  • Installation of pipe and structures - finished
  • Base paving - Finished
  • Grinding and surface paving - end of September
Portland Road Route 1: Complete
  • Shim and grinding - May 9 - May 16
  • Curbing and utility adjustments - first week in July
  • Surface Paving - ending week of July 30
  • Striping - done
  • Project is finished
Flag Pond Road: Complete
  • Reclaim and base pavement - complete
  • Temporary striping - complete
  • Shouldering work - complete
  • Surface paving - complete
  • Project is finished
Jenkins Road: Complete
  • Reclaim and base pavement - complete
  • Temporary striping - complete
  • Shouldering work - 85% complete
  • Surface paving - ending mid September
  • Flag Pond road
  • Reclaim and base pavement - finished
  • Surface paving - ending mid September
  • Project is finished
Ferry Road - Section from Seaside to Bayview: Complete
  • Ditching culverts finished
  • Reclaiming - finished
  • Paving delaminated pavement - finished
  • Shim pavement - finished
  • Adjust manholes - finished
  • Surface pavements - finished
Ferry Road - Section from Bayview to Glenhaven: Complete
  • Ditching culverts - July 30
  • Reclaiming - finished
  • Paving delaminated pavement - finished
  • Shim pavement- finished
  • Adjust manholes - finished
  • Surface pavements - finished
Ferry Road - Section from Glenhaven to Elmwood
  • Ditching culverts - July 30
  • Reclaiming - finished
  • Paving delaminated pavement - finished
  • Shim pavement - finished
  • Adjust manholes - ending September 10
  • Surface pavements
  • Shouldering - October 15
Ferry Road - Section from Elmwood to Pine Ridge: Complete
  • Ditching culverts - finished
  • Reclaiming - finished
  • Paving delaminated pavement - finished
  • Concrete curbing - finished
  • Shim pavement - finished
  • Adjust manholes - finished
  • Surface pavements finished
  • Shouldering- October 15
Hillview Heights: Complete
  • Ditching culverts - ending July 30
  • Reclaiming - finished
  • Shim pavement - ending July 23
  • Adjust manholes - ending July 30
  • Surface pavements ending August 13
  • Project is finished
Garfield Street
  • Box cut and rebuild street, sidewalk, and storm drainage between North and Shadagee
    • Box cut - complete
    • Regrade and pave - complete
    • Sidewalk October 4
  • Partial box near Miranda - Fall of 2010
  • Mill section - Spring 2011
  • Overlay entire length - Spring of 2011
Cross Street
  • Overlay - fall 2010
Lincoln Street - Maple to Boom
  • Minor Drainage work - Fall 2010
  • Reclaim Fall 2010
  • Shim and pave - Fall 2010
Berry Road and Michelle Way
  • Install new drainage from Michelle Way to gravel pit November 2010
  • Reclaim and pave Spring 2011
Franklin Street cross country interceptor
  • Replace manholes in Franklin Street and Oak Street
  • Slipline cross country run
  • Reconnect house connections
  • Loam and seed
  • Project is finished
Grant Road
  • Adding additional culvert at Boynton Brook - October 2010
Cleveland Street
  • Replace 200 feet of failing sewer line Starting week of October 4
  • Reconnecting and/or replacing house services as needed Week of October 11
These schedules will be adjusted periodically based on weather and paving schedules. We will be adjusting this schedule each Friday.



Need an answer?
Have a problem?
Try the
Help Desk

En français


Services
Get a form
Pay city bills
Register your car
Register your snowmobile
Register your boat
Get a fishing license
Pay traffic violationsSearch marriage/death archives


Information
Find your ward
City Hall telephone numbers
More information



GIS MAPPING
You can now research property lots through the city's Geographic Information System (GIS) maps. Just follow this link. Note: This will take you off the City of Saco website.