- Based on a predicted rain event of 1 inch or more in a 24 hour period, the Saco Public Works Director will notify the Saco Dispatch (284-4535) that the bridge is closed.
- Saco Dispatch shall notify the following departments or agencies:
- Buxton Dispatch - 207-929-5151
- Saco Fire Department -207-282-3244
- RSU 23 - 207- 284-5959
- Saco Department of Public Works (DPW) will post the bridge status on the dedicated phone line 282-7669.
- DPW will send an email notification to the interested parties that have requested inclusion on the email notification (contact Amy Oliver at aoliver@sacomaine.org ) to be added to the list.
- Signs in Saco and Buxton will be changed by the respective municipalities to notify the public of the bridge status.
- The closing will remain in effect until the Saco Engineer inspects and determines that the bridge can be reopened.
- After reopening determination, the Saco Public Works Director will notify the Saco Dispatch that the bridge will be reopened.
- Saco Dispatch shall notify the following departments or agencies that the bridge has been reopened:
- Buxton Dispatch - 207-929-5151
- Saco Fire Department -207-282-3244
- RSU 23 - 207- 284-5959
- Emails and phone messages will be changed by the Saco DPW changing the bridge status to open.
- Buxton and Saco will change out the signage in both municipalities.